The advantages of speed, efficiency, and reduced cost will lead to precast concrete lifting, in 2025, being the most in demand repair approach.
It consists of lifting in place, with minimal onsite work, factory-made precast concrete panels to repair slabs, walls, and pavements. Recent developments have shown it to be more durable and reduce repair duration by weeks.
Weaknesses of Precast Concrete
Precast concrete is manufactured in a factory within a controlled environment. It is shaped and cured into panels or blocks. The difference between this and pouring concrete at the work site is that concrete manufactured offsite has uniform quality.

In addition, there are fewer cracks that would result from poor control of weather and work speed. Terms such as “precast concrete,” “concrete forms,” “block wall,” “precast,” and “concrete anchors” are some of the key phrases of this process that have been used in this particular instance as reference.
Production of concrete blocks allows room for precise distribution of lifting points integrated with concrete anchors from the outset.
Spread evenly to avoid transport breaks and weight loss during transport, the anchors are integrated with cranes for safe use. In 2025, precast concrete will incorporate smart sensors to monitor, in real-time, stress to detect fractures.
The Process of Concrete Lifting in Conjunction with Precast
Concrete Lifting is the process of raising a damaged or sunken slab and is done by using cranes attached to precast concrete.
For newly lifted areas, teams will install new precast panels and grout them. This method is often appropriate for industrial floors, driveways, and sidewalks as these areas may cost money in downtime.
There is planning to ensure that the lift angles are under 60 degrees to maintain safety protocols, and the crane has 10% capacity reserved for swings.
New tools that are coming out in 2025, such as vacuum lifters, will allow for these lifts to be “invisible” as there will be no visible markings on the previously finished lift.
Key Benefits Over Traditional Fixes
Lifting precast concrete finishes these jobs faster compared to mudjacking and full replacements. Panels are fully cured in the factory, so there is no 7-10 day waiting period for on-site concrete. It also keeps construction sites a lot cleaner as there is a lot less waste and mess.

The cost is predicted to drop 20-30% in the long run with the new technology as there will be less labor and no weather delays. Panels are also less likely to crack with a better distribution of even stress via anchors.
Latest 2025 Updates in Precast Tech
India’s concrete lifting Expo 2025 will highlight new lifts such as Combilift cranes that are capable of handling oversized panels, as well as other tools designed for lifting heavy loads.
Smart precast using IoT wearable technology is also being developed for use in construction, however, the greatest focus has block wall on wear and tear in earthquake-prone areas for smart precast.
In factories, artificial intelligence is used to find and eliminate quality control defects, especially when there is a defect pattern that is repeated.
The global market has grown to $21.8 billion, thanks to the quick installations of renewable technologies such as EV chargers. Anchor systems can elevate walls of up to 22 tons without toppling over.
Precast vs. Other Methods of Repair
Precast and traditional cast-in-place methods differ, as precast can lift walls in a single day. In concrete lifting, cast-in-place requires placement of a frame on the site to cure before walls can be lifted, which slows the entire operation.
Polyurethane foam can be used to lift precast slabs. However, it does not have the same strength as precast concrete, which can be an issue under heavy traffic.
The attached table shows the balance of precast concrete over the rest for 2025 projects.
| Repair Method | Time to Finish | Durability | Cost Savings | Best For |
| Precast Concrete Lifting | 1-2 days | High (factory cured) | 20-30% lower long-term | Slabs, walls, pavements |
| Cast-in-Place | 7-14 days | Medium (site variables) | Higher upfront | Custom shapes |
| Polyurethane Foam | Hours | Low for heavy loads | Low material | Light slabs only |
| Full Replacement | Weeks | High but disruptive | Least efficient | Total failures |
Real World Wins and Safety Tips
By 2025, project case studies demonstrate how precast concrete lifting has improved the speed of pavement repair.
One site used four lift points to swap CRCP slabs in a matter of hours. In anticipation of rainfall, EV foundation installations totaled 50 before the end of the year.

Reliability for tall buildings can be achieved by ensuring manual lifts over 15kgs are not used, as well as pre-planned anchors and training on code-compliant tilts for walls, which can be done safely.
Why Choose It for Your Repair
Precast concrete lifting systems offer ease, adaptability, and minimal site disruption, whether on a construction site for a new house, a new factory, or an existing building.
It also provides an opportunity to better assess the structure for seismically active environments by future-proofing it. No crew downtime is incurred by the contractors due to mitigating scheduling delays.